Do you know how to debug the automatic installation machine

Feb 24, 2023 Остави поруку

 

Nowadays, automated technology has continued to develop. In order to save costs and improve production efficiency, most companies will choose automated packaging machinery for product packaging. The automatic installation machine is a type of automated machinery. The automatic installation machine uses automatic feeding, box, box, box, and waste. The structure is compact and reasonable, and the operation adjustment is simple. Effectively improve the production efficiency of enterprises.
The automatic installation machine is a high -tech product that integrates light, electricity, gas, and machinery. Suitable for a variety of products automatic boxing. Its working process is the transmission of items; the carton is automatically opened and transmitted, and the material is automatically loaded into the carton; and the complicated packaging process such as the paper tongue at both ends is completed.
Automatic installation machine debugging tutorial; After the fully automatic installation machine is installed, first debug the machine, connect the power supply, turn on the control panel power switch, stop the switch button, check whether the parameters of the box display screen are normal.
Adjustment of the size of the box: The main adjustment of the paper box, the adjustment of the box chain, according to the size of the size of the box, the length, width, height size of the box chain.
First, put the carton we are going to adjust to the box seat, and then adjust the various directions of the box seat to the edges near the box. Put the box to stabilize and do not fall.
Second, the length of the carton box is adjusted: put the sealed carton on the box conveyor belt, and then adjust the hand wheel on the right to make the installation machine conveyor belt and the edge of the carton.
Third, the width adjustment of the carton: first release the two spindle screws outside the main chain. Then put a carton in the middle of the chain and adjust the width of the chain to the same width as the width of the box. Then lock the rocket screw in the back.
Fourth, the height adjustment of the carton: Remove the two tight fixed screws before and after the upper and back of the upper and after -pressure guide rails, and then rotate the above hand wheel to contact the upper guide rail with the paper box with the guide rail. Then lock the fixed screw.
Fifth, the size of the feed grid: unscrew the fixed bearing screw, put the product in the pushing board, and move the baffle left and right until the appropriate size is adjusted to lock the screw. Note: There are several screw holes in the panel here. Be careful not to twist the screw when the machine is adjusted.